Fill the hole with Fast-Setting Concrete up to 3 to 4 inches below ground level. Pour about a gallon of water per 50 lb bag into the hole and allow the water to saturate the concrete mix. Wait about 4 hours to begin constructing your fence or applying heavy weight to your post.

What is the best concrete mix for fence posts?

For a small to mid sized job I recommend going with premixed. The best concrete mix for fence posts I’ve found is Quikrete Fast Setting Concrete Mix in a 50 lb bag. It’s 4000 psi, easy to work with, sets up fast, and doesn’t need to be mixed. Just pour it in the hole and soak with water.

How many bags of quikrete do I need for a fence post?

When you account for the fence post what you need is 4 bags. The best way to determine the size of each fence post hole is: The diameter of the hole is 3 times the width of the fence post. The depth of the hole is 1/3 to 1/2 the above ground height of the fence post.

How many bags of quikrete do I need for a 4x4 post?

When you’re installing a fence post, the amount of concrete you need will be calculated based on the diameter of your fence post and how high the post is above ground. Most fence post holes will need between 1 – 4 bags of concrete to securely hold the post in place.

What type of cement is used for posts?

Fast-setting concrete is ideal for setting posts because there’s no mixing—you simply pour the dry concrete from the bag right into the hole, then add water.

How much post mix do I need?

The exact amount of Post Mix Concrete needed will vary depending on the width and depth of the hole, but as a general rule you’ll need about one and a third bags for a standard fence post.

How big of a hole do I need for a 4x4 post?

The diameter of your post hole should be three times the diameter of your post. So, if you’re planning on using a four-inch round or 4×4-inch square post, your post hole will need to be 12 inches in diameter. For a six-foot-high fence post, we would need a hole that’s 36 inches deep and 12 inches in diameter.

How far apart do you set fence posts?

Most fence posts can be spaced 8 to 12 feet apart. While this is a general criteria, it doesn’t cover all scenarios. For instance, high tensile fence can have larger spacing, requiring line posts every 15 to 20 feet for field fence styles, and as much as 20-30 feet for high tensile barbed and smooth wire.

Is 2 ft deep enough for fence post?

2 feet is the minimum depth that you should dig your fence post holes for. To dig the holes one-third to one-half of the post’s aboveground height, is a general formula. The deeper you dig the holes, the more stability your fence has.

How many square feet does a 50 lb bag of quikrete cover?

60 cubic feet. One 50-pound bag of Quikrete Fast Setting Concrete Mix yields about . 375 cubic feet. For example, if you need to cover 33.333 cubic feet, using 60-pound bags of concrete, divide 33.333 cubic feet by .

Article first time published on

Do you have to mix quikrete?

Whether you are building a new fence, setting a mailbox or anchoring a basketball goal or play set, QUIKRETE® Fast-Setting Concrete is the ideal product for the job. With Fast-Setting Concrete there is no mixing or tools required – You simply pour the dry mix right from the bag into the hole, then add water.

How much water do you add to 60 lb bag of quikrete?

Pour water into the dry mix until the powder is saturated with water. Depending on soil conditions, this will require about 1-1/4 gallon (4.7 L) of water per 60 lb (27.2 kg) bag.

How much water do you mix with quikrete?

Just don’t use salt water. Salt will weaken your concrete. The correct ratio of water to Quikrete mix is 3 quarts of water for each 80 pound bag. Pro Tip: Measure out your water the first time and then pour it into a 5 gallon bucket.

Should I use concrete to set fence posts?

Do Fence Posts Need To Be Set in Concrete? No, fence posts don’t need to be set in concrete, and there are plenty of other ways to fix your posts if this feels a bit too permanent. If you are using wooden posts, concrete may actually be the worst option.

How do I keep my post level while concrete dries?

You need to level it in two directions with a 4-foot level. After getting it straight in the first direction, hold one of the braces against the post and drive a single screw to connect the brace to the post. You can then level and brace the post in the other direction and begin filling the hole.

How do you level posts on uneven ground?

The way to do that is to drill your holes (3 feet to 3–1/2 feet deep in most applications) and use longer posts. You then determine the height you want where the ground is highest and use a string line and a level to mark all of the posts to the same height. Then you cut post off to that height.

What kind of gravel should I use for fence posts?

Pea gravel is commonly used for fence post holes. Gravel that is roughly three eighths of an inch in size is generally a good medium between drainage and support, though gravel close to that size also may be used.

How do you mix concrete posts?

In terms of the ratio to use for a concreting fence posts, the best mix is a mix of 1:2:4 (1 cement, 2 sand, 4 aggregate). Concrete is always best mixed using a cement mixer to ensure it’s even, but if you only need to mix a little, hand mixing is ok (see mixing concrete project above for tips on how to do this).

How do you use post mix?

  1. Dig hole to correct depth and width relevant to post size.
  2. Fill hole approximately a third of depth with water and place post in hole.
  3. Pour in postmix evenly around the post until no standing water is visible.
  4. Position and level post as required. …
  5. Do not mix postmix with water by hand or machine.

Can I use post mix to lay slabs?

2 Answers from MyBuilder Groundworkers Recommend Just a decent hard-core sub base (100mm+) with ideally a 6:1 part dry ballast mix and to lay the slabs 6:1 sand & cement will suffice .

What size post do I need for an 8 foot fence?

A common rule of thumb, is to dig the hole 3 times as large as the post, and to a depth of 1/3-1/2 of the post height above ground. so for a 8′ high fence, using 4×4 posts. dig the holes 12″ in diameter, to a depth of 2 1/2 – 4′. Of course, that’s assuming you’re setting the posts in concrete.

How tall should a fence be for a 6-foot fence?

As a general rule of thumb, you’ll need to place at least 1/3 the height of the post in the ground. For example, a 6-foot tall fence will need at least 2 feet of post in the ground.

How deep should an 8ft fence post be?

How Deep Should a Fence Post Be? For an average fence post, about 6 to 8 feet tall, prepare to dig a post hole about 2 feet deep. To install a fence post, you’ll need a shovel or post digger, a 6-foot level, soil, and gravel or crushed stone.

How far apart should 4x4 fence posts be?

The spacing of fence posts depends on the length of the fence, the posts should be spaced evenly. For example, if the fence is 30 feet long space the fence posts six feet apart if the fence is 40 feet in length space the posts eight feet apart.

Does fence go on inside or outside of posts?

Fence posts should be on the outside of the fence The correct installation of ag fencing is to place it on the inside of the posts. This way, animals in the enclosure brush against the wire, not the posts.

How deep should I bury my fence post?

Dig post hole so diameter of the hole is 3 times the width of the post (i.e., the hole for a 4” wood post should be about 12 inches wide). The depth of the hole should be 1/3-1/2 the post height above ground (i.e., a 6-foot tall fence would require a hole depth of at least 2 feet).

How much water do you mix 50 lb bag of quikrete?

Depending on soil conditions, this will require about 1 gallon (3.8 L) of water per 50 lb (22.7 kg) bag. For holes deeper than 2′ 6″ (0.8 m), place the material in lifts of 2′ 6″ (0.8 m) or less to allow water to soak all the way through.

How many bags of concrete do I need for a 8x10 slab?

Regarding this, “how many bags of concrete do I need for a 10×8 slab?”, at 4 inches thick, generally you will need approximately either 58 bags of 60lb or 45 bags of 80lb of premixed concrete for a 10×8 slab, at 5 inches thick slab, either 73 bags of 60lb or 56 bags of 80lb premixed concrete are required, while at 6 …

How many bags of concrete are in a 3.5 cubic feet mixer?

I have a mixer that is advertised as being 3.5 cubic feet. My experience is that this mixer will handle up to two 60 pound bags or one and a half 80 bags at a time; anything more, and mix will spill out of the mixer when it is trying to mix the mix. 120 pounds of concrete mix makes about 0.9 cubic feet of concrete.

How much water do I mix with 80 lb bag of quikrete?

For each 80 lb (36.2 kg) bag of QUIKRETE Concrete Mix to be mixed, add approximately 6 pt (2.8 L) of fresh water to the mixer. Turn on the mixer and begin adding the concrete to the mixer.

Can you mix Quikrete and Sakrete together?

Quikrete is commonly used to repair sidewalks, curbs, ramps, steps, and footings. … Even though Sakrete and Quikrete may vary in the materials they’re made up of, sometimes the packaging companies who package the concrete mixtures for Sakrete and Quikrete will use the same materials for both kinds of mixes.